Browsing Tags

placed

Watch Norwegian Breakaway’s Bow Be Lowered Into Place (Video)

Just over a week ago, the Norwegian Breakaway’s hull was completed in Papenburg, Germany at the Meyer Werft Shipyard. On Wednesday, October 17th, the ship’s bow was lowered into place. The bow, known as block 73, weighed...